1. Before cleaning the equipment, wipe the workbench, machined surface, and electroplated parts with oil-stained cotton yarn before starting the equipment. Wipe clean with clean cotton yarn to avoid contamination of the profile. If necessary, you can also use a dust blower to work. Clean the surface of the table and other parts.
2. Checking the looseness of the mechanical connection fasteners on the fastener equipment usually causes process problems in the processing, and even brings equipment failure or unsafe factors. For the tightening that may be loose during work due to frequent adjustment or normal use Check frequently and tighten in time to ensure that the equipment works under safe conditions.
3. Check the lubricating parts. For the fixed contact surfaces that have relative movement during the operation of the equipment, such as the surfaces of the machine tool guide rails, bearings and shafts, etc., where lubrication is needed, you should add lubricating oil or a lubricating chest according to factors such as motion characteristics 1 Purpose to lubricate silicon. The mechanical structure of the specific equipment is different, and its lubrication position and lubrication method are different. It depends on the specific equipment. The air source processing triplet that is widely used in door and window assembly equipment must be checked for the oil level in the oil cup of the oil mister and maintained at an oil level that is difficult to determine before each startup.
4. Check the equipment power supply and gas supply. Most automatic door and window assembly equipment are electrical and pneumatic control equipment. Normal power supply and gas supply should be ensured to ensure the normal operation of the equipment. Otherwise, the lighter may cause problems such as the equipment not working as scheduled or affecting the processing quality, and the serious may cause safety accidents. Therefore, before starting the work, it is very important to check the power supply and gas supply of the equipment to ensure normal production.
5. Except for the ground plastic steel door and window assembly equipment, except for a few devices such as welding machines and sink milling machines in the form of linear arrangements that supply single-phase power, the remaining equipment is powered by three-phase four-wire. To ensure the safety of personnel, the equipment should be reliably grounded according to the regulations, and the grounding should be checked before each start-up.
6. Inspection of equipment process parameters and status During the automatic door and window assembly process, the normal setting of equipment process parameters is usually a key factor in ensuring the equipment processing process conditions, especially the equipment process parameters of key processes such as sawing and welding. Settings are more important. Before starting the operation, generally check the technological status of the equipment to make it within the appropriate range. Correct adjustment of the process status of the equipment is also an important guarantee for the normal use of the equipment.